RSS Amplifier

Blog

Dennis' Vernacular Victorian

I write about restoring my old 1900s home and cottage in Wildwood, NJ.

dennispierce.substack.comSource feed ↗10 posts

Live Last read · last published · next check

Latest posts

Finishing the Side Door

Now that the cottage is ready to go for Summer, I turn back to work in the house.

More Cottage Prep

Continuing with the cottage prep, I had an appliance repairman replace the gasket on the refrigerator.

Cottage Prep

I pause the work in the dry kitchen to start getting the cottage ready for summer rental.

Pulling up an Old Floor

With the plastering done and a first coat of stain on most of the woodwork, I turn my attention to the floor.

Plastering the Dry Kitchen

With the coat of stain mostly dry, I flip the painter’s tape over from covering the plaster to covering the woodwork because the next phase of work is plastering the room.

More Prepping of the Built-in

While the stain dries, I move back to the built-in to keep getting this ready for staining.

Staining the Woodwork

With the ceiling’s first coat of plaster done, I’m going to give a shot to staining the wood molding first and then plastering.

First Coat on the Ceiling and Continuing to Strip the Built-In

It’s always a balancing act to figure out when to plaster versus when to stain and varnish the wood.

Prepping the Woodwork for Stain

While I struggle stripping all the remaining paint from the nooks and crannies in the built-in, the rest of the molding is moving towards staining.

Frozen Pipes and Revisiting the Built-In

Over the last few weeks there’s been a huge cold spell in the Northeast.