Jump to content

Motorways of Pakistan

From Wikipedia, the free encyclopedia

Motorways of Pakistan
Pakistan motorway sign
Map
System information
Maintained by National Highway Authority
Length2,864 km (1,780 mi)
Formed1997
Highway names
System links

Motorways of Pakistan (Urdu: پاکستان کے موٹروے) are a network of multiple-lane, high-speed, controlled-access highways in Pakistan which are owned, maintained, and operated federally by Pakistan's National Highway Authority. Motorways are a part of Pakistan's "National Trade Corridor Project" and "China-Pakistan Belt Road Initiative," from Khunjerab Pass near the Chinese border to Gwadar in Balochistan and Karachi in Sindh. There are a total of 16 motorways, 10 of which are fully operational, while some are under construction and others are planned. At present, 2,864 kilometres (1,780 mi) of motorways are operational, while an additional 946 kilometres (588 mi) are under construction.

All motorways in Pakistan are prefixed with the letter 'M' (for "Motorway") followed by the unique numerical designation of the specific highway (with a hyphen in the middle), e.g. "M-1".[1]

History

[edit]
M-2 motorway in the Salt Range
M-2 motorway exit to Sargodha

Pakistan's motorway network is a key component of the "National Trade Corridor Project" (NTCP), which aims to connect Pakistan's three Arabian Sea ports Port of Karachi, Port Qasim, and Gwadar Port with the rest of the country through an integrated network of motorways, national highways, and expressways. The corridor also strengthens regional connectivity with Afghanistan, Central Asia and China. In addition, the China Pakistan Economic Corridor (CPEC) utilizes Pakistan's highways, motorways and expressways network to connect Gwadar Port with Kashgar, China enhancing regional trade and economic integration.

The development of Pakistan's motorway system began in the early 1990s with the objective of improving road safety, reducing travel time, and promoting economic growth. The foundation of the motorway network was laid on 30 December 1991, when the contract for the M-2 Lahore–Islamabad Motorway was awarded to the South Korean company Daewoo. The M-2 Motorway was inaugurated on 26 November 1997, becoming Pakistan's first motorway and the first modern motorway in South Asia. Its success led to the expansion of the national motorway network with the M-3 (Pindi Bhattian–Faisalabad) in 2003, M-1 (Islamabad–Peshawar) in 2007, M-9 (Karachi–Hyderabad) in 2018, the Lahore–Abdul Hakeem section of M-3, M-4 (Pindi Bhattian–Multan), and M-5 (Multan–Sukkur) in 2019, M-11 (Lahore–Sialkot) and M-15 (Hazara Motorway) in 2020, and M-14 (Hakla–Dera Ismail Khan) together with the completion of M-8 (Ratodero–Gwadar) in 2022. These motorways have significantly improved national connectivity, facilitated trade and tourism, and contributed to Pakistan's economic development. The motorway network continues to expand under the supervision of the National Highway Authority (NHA).

List of Motorways

[edit]

Main Motorways

[edit]
Sign Name Route Length (km) Lanes Completion Year Status Remarks
M-1 M-1 Motorway PeshawarIslamabad 155 6 2007 Operational --
M-2 M-2 Motorway IslamabadLahore 375 6 1997 Operational --
M-3 M-3 Motorway LahoreAbdul Hakeem 230 6 2019 Operational --
M-4 M-4 Motorway Pindi BhattianMultan 309 4-6 2019 Operational The route between Pindi Bhattian and Faisalabad is planned to be upgraded from 4 to 6 lanes.
M-5 M-5 Motorway MultanSukkur 392 6 2019 Operational --
M-6 M-6 Motorway SukkurHyderabad 306 6 -- Under Construction Expected to be completed by 2029.
M-7 M-7 Motorway DaduHub 270 -- -- Planned --
M-8 M-8 Motorway RatoderoGwadar 892 2 In Sections
  • 2016
  • 2018
  • 2022
Partially Operational The Hoshab – Khuzdar section is currently under construction.
M-9 M-9 Motorway HyderabadKarachi 136 6 2018 Operational
M-10 M-10 Motorway Karachi Northern Bypass 57 2 2007 Operational The 168 km route is planned to be upgraded from 2 to 6 lanes, with completion expected by 2029.
M-11 M-11 Motorway LahoreSialkot 89 4 2020 Operational The route is planned to be upgraded from 4 to 6 lanes.
M-12 M-12 Motorway SialkotKharian 69 6 -- Under Construction Expected to be completed by 2029.
M-13 M-13 Motorway KharianRawalpindi 117 6 -- Under Construction Expected to be completed by 2029.
M-14 M-14 Motorway IslamabadD.I Khan 285 4 2022 Operational
M-15 M-15 Motorway Hasan AbdalThakot 180 2-4-6 2020 Operational Also known as Hazara Motorway.
M-16 M-16 Motorway Nowshera–Fatehpur 160 4 2019 Phase I Phase I Operational Also known as Swat Motorway.

Phase II: The Chakdara – Fatehpur section (80 km) is currently under construction and is expected to be completed in 2028.

Auxiliary Route Motorways

[edit]
Sign Name Route Length (km) Lanes Completion Year Status Remarks
-- Gujranwala Expressway Gujranwala-Wahndo 15.2 4 2024 Operational Auxiliary route of M-11 Motorway

Proposed Motorways (Unofficial)

[edit]
Sign Name Route Length (km) Lanes Completion Year Status Remarks
-- M-17 Motorway LahoreSahiwalBahawalnagar 295 6 -- Planned Approved by ECNEC on Aug 2023. Cost Revised on Mar 2025.
-- M-18 Motorway PeshawarD.I. Khan 360 4 -- Planned Approved by ECNEC on 10 Sep 2021.[2][3]
-- M-19 Motorway ChakdaraRabat 30 4 -- Planned Also known as Dir Motorway.

Approved by ECNEC on 10 Sep 2021.[4][5]

-- Mansehra-Chilas Mansehra-Chilas 172 4 -- Planned
-- Mansehra–Muzaffarabad–Mirpur Motorway

(MMM-Motorway)

MansehraMuzaffarabadMirpur 200 4 -- Planned[6] --
-- Peshawar–Kabul–Dushanbe motorway PeshawarKabulDushanbe 265 6 -- Planned --

Map of Motorways

[edit]
Map of road systems in Pakistan

Patrolling and Law Enforcement

[edit]
Motorway police patrolling the M-2 motorway

Pakistan's Motorways are patrolled by Pakistan's National Highways & Motorway Police (NH&MP), which is responsible for enforcing traffic and safety laws, maintaining security and providing assistance to motorists across the motorway network. The NH&MP uses SUVs, patrol cars and heavy motorcycles for motorway patrols, while speed cameras are employed to enforce speed limits. The NH&MP operates a 24-hour nationwide helpline, 130, which can be accessed from both mobile phones and landline telephones.

Speed Limits

[edit]

Pakistan's motorway system is governed by strict traffic laws to ensure road safety. The maximum speed limit is generally 120 km/h for cars and light vehicles and 110 km/h for buses and heavy vehicles, unless otherwise indicated by road signs. Drivers must wear seat belts, follow lane discipline, avoid using mobile phones while driving, and obey all traffic signs and signals. Speeding, reckless driving, and other traffic violations can result in fines, penalty points, or legal action by the NH&MP. Following these rules helps reduce accidents and ensures safe and efficient travel on Pakistan's motorways.

M-TAG

[edit]
A RFID MTAG used for electronic toll collection in Pakistan.
A RFID MTAG used for electronic toll collection on controlled-access highways/motorways/expressways within Pakistan.

In 2016, NHA implemented electronic toll collection on M2 motorway in partnership with One Network that uses a RFID-based tag called the "M-TAG".[7] The tag is attached to the windscreen of vehicles and is automatically scanned at toll plazas on entry and exit, meanwhile debiting the calculated toll tax from a prepaid M-TAG account.[8][9] The service has since been expanded to all motorways, except M-8, and is also used on Lahore Ring Road.[10][11]There are M-Tag refilling stations on each toll plaza which is equipped with M-TAG in which you can create and put money in your account. In 2025, the federal government, enforced a new policy regarding entering into ICT-Islamabad (Islamabad Capital territory) will only be allowed to vehicles having an M-tag, which was enforced in February 2026.[citation needed]

Emergency Runways

[edit]

The M-1 motorway (Peshawar–Islamabad) and the M-2 motorway (Islamabad–Lahore) each feature two 9,000 feet (2,700 m) emergency runway sections. These four specially designed sections can be made operational by removing the detachable concrete median barriers with forklifts, allowing military aircraft to use the motorways as an emergency airstrip during wartime or military exercises.

2000 – Motorway Landing Exercise

In 2000, the Pakistan Air Force conducted its first publicly known motorway runway exercise on the M-2 motorway. The exercise demonstrated the ability of fighter, trainer, and transport aircraft to operate from a motorway instead of a conventional airbase. Aircraft involved included F-7P fighter aircraft, Super Mushak trainer aircraft and, C-130 transport aircraft. The successful operation validated Pakistan's ability to disperse aircraft during conflict and maintain air operations even if conventional airbases became unavailable.

2002 – Motorway Operational Demonstration

In November 2002, the Pakistan Air Force again used the M-2 motorway for operational landing and take-off exercises. The exercise reaffirmed the effectiveness of motorway runways as alternate operating bases and demonstrated rapid deployment and recovery capabilities. Participating aircraft included F-7P and Mirage III fighter aircraft. Following the exercise, the Pakistan Air Force indicated that motorway runway operations would remain part of its periodic operational training.

2010 – High Mark Exercise[12]

On 2 April 2010, during the large-scale High Mark 2010 air exercise, the Pakistan Air Force once again activated an emergency runway section on the M-2 motorway. The exercise demonstrated the ability to land, refuel, rearm, and launch combat aircraft from a motorway under simulated wartime conditions. Participating aircraft included F-7P and Mirage III. This exercise highlighted the Pakistan Air Force's ability to sustain combat operations from dispersed locations while reducing dependence on permanent airbases.

2019 – Operational Readiness Exercise

In March 2019, the Pakistan Air Force conducted another motorway runway exercise as part of its operational readiness program. Fighter aircraft successfully performed take-offs and landings on a designated motorway section, demonstrating the service's continued emphasis on dispersed air operations and survivability during high-intensity conflict. Participating aircraft included JF-17 Thunder and Mirage 5 fighter aircraft, Super Mushak trainer aircraft, and C-130 transport aircraft. The exercise reaffirmed the PAF's ability to conduct sustained air operations from dispersed locations using motorway runways.

See also

[edit]

References

[edit]
  1. "National Highways Authority – Committed to Excellence". Retrieved 24 October 2020.
  2. "KP CM congratulates people on approval of Peshawar-D.I Khan, Dir Motorway". dunyanews.tv. 14 February 2008. Retrieved 12 September 2021.
  3. "Peshawar-DI Khan Motorway PC-1 approved". www.thenews.com.pk. 12 August 2021. Retrieved 12 September 2021.
  4. "KP CM congratulates people on approval of Peshawar-D.I Khan, Dir Motorway". dunyanews.tv. 14 February 2008. Retrieved 12 September 2021.
  5. "Peshawar-DI Khan Motorway PC-1 approved". www.thenews.com.pk. 12 August 2021. Retrieved 12 September 2021.
  6. "AJK terms MMMM Expressway project of exceptional significance". www.nation.com.pk. Archived from the original on 30 December 2018.
  7. "Peshawar-Islamabad Motorway: Motorists demand restoration of e-tag system". The Express Tribune. 10 September 2016. Retrieved 9 December 2022.
  8. "Vehicles without M-Tag banned on M2". The Express Tribune. 6 December 2021. Retrieved 9 December 2022.
  9. "SERVICES". One Network. Retrieved 9 December 2022.
  10. Gulrez, Ali (3 December 2022). "M-TAG Now Operational on Multan-Sukkur Motorway M-5". INCPak. Retrieved 9 December 2022.
  11. Gulrez, Ali (15 December 2021). "MTag Registration Centers in Lahore". INCPak. Retrieved 9 December 2022.
  12. PAF Conducts Fighter Operations from Motorway Pakistan Air Force, Government of Pakistan website, Published 2 April 2010, Retrieved 2 March 2022
[edit]