RSS Amplifier

Kane Mar · Jul 21, 2026

The Epic Illusion

0
Sign in to vote or save

Kane Mar · Kane Mar

The software industry loves the word “Epic.” Product managers map them on roadmaps, engineering leads debate their boundaries, and Jira administrators enforce rules about which stories can live without them. We treat Epics as if they are a foundational law of agile development.

They aren’t. In fact, if you open the official Scrum Guide and search for the word “Epic,” you will find exactly zero results.

So how did an entire industry become obsessed with managing, refining, and refereeing an arbitrary process container that doesn’t actually exist in the core framework?

To find out, we have to look back to 2004.

When Mike Cohn published User Stories Applied: For Agile Software Development in 2004, he introduced the concept of an epic with a highly practical, conversational definition. He noted that when a user story is too large, it is sometimes referred to as an epic.

Cohn wasn’t inventing a new layer of corporate governance. He was using the word “epic” as an adjective. It was a simple shorthand descriptor to say, “We wrote this requirement down, but it’s currently too big to implement directly. We need to break it down later.”

It was a placeholder for a future conversation, designed to be temporary.

But as agile scaling frameworks and project management tracking tools swept through the enterprise market, they ran into a problem: software architectures and database schemas require rigid hierarchies. They needed a structural parent container.

So, Jira and other enterprise tools took Cohn’s casual adjective and turned it into a permanent, hard-coded noun.

When software vendors turned a casual adjective into a hard-coded database requirement, they didn’t just add a layer of bureaucracy; they created a semantic mess. Because there is no official framework definition for these containers, each tool vendor simply invented their own hierarchy.

The result is a hilarious game of corporate musical chairs.

If your organization uses Atlassian Jira, the standard hierarchy dictates that an Epic sits at the top, acting as the parent container that decomposes down into Features and Stories.

But if your enterprise migrates over to Microsoft Azure DevOps (ADO), the exact opposite happens. In ADO’s default Agile process template, a Feature is the parent container, which then breaks down into Epics and Stories.

Think about how absurd this is. Two multi-billion-dollar platforms use the exact same vocabulary to build completely inverted structures.

When a company switches from Jira to ADO, teams are forced to spend weeks re-mapping their brains and their backlogs, arguing over whether a piece of work is a “Jira Epic” or an “ADO Feature.” This isn’t software engineering; it is semantic gymnastics. It is the ultimate proof that these containers are entirely made up, serving the limitations of the database rather than the needs of the product.

The moment the industry turned “Epic” into a formal backlog layer, it introduced a systemic defect: the management of administrative containers over the production of direct value.

Because there is no formal, scientific definition of what an Epic is, it becomes an arbitrary bucket. In the average enterprise, an Epic can be a massive feature, a vague business objective, a loose theme, or simply a collection of unrelated tasks that a manager wanted to group together for a quarterly report.

This ambiguity creates immediate organizational friction:

  1. Process Refereeing: Product Owners and Scrum Masters spend valuable hours debating whether a ticket belongs to “Epic A” or “Epic B,” or creating complex rules about how epics must be estimated.

  2. Artificial Bottlenecks: Teams begin waiting for an entire Epic to be fully refined before starting work, delaying the delivery of smaller, independent increments of value that are ready to go.

  3. Loss of Transparency: Large, sweeping containers hide the actual flow of work. They create an illusion of progress while masking micro-bottlenecks and dependencies underneath.

When you strip away the tool-enforced hierarchies, the core Scrum framework operates on a beautifully simple mechanism: The Product Backlog. The framework relies on a highly prioritized, flat list of items anchored directly to a single, tangible Product Goal.

Items at the top of the backlog are small, detailed, and ready for immediate execution. Items further down the list are larger, less defined, and inherently vague. You do not need a middle layer of governance to tell you that a item is big. Its position at the bottom of the backlog already communicates its maturity.

By eliminating the artificial “Epic” layer and returning to a value-driven, transparent backlog, organizations instantly remove the administrative overhead that slows down delivery.

The goal of agile development is not to build a beautifully categorized library of tickets. It is to produce working software. It’s time to stop managing the containers and start focusing back on the value.

Read the original on agilefederation.substack.com

Comments

Nothing yet. Say the first thing.

    Sign in to join the conversation.