Unladen swallow - Olivier Wulveryck · Jul 9, 2026
Same Task, Two Endings: A Payment Integration With and Without the Planning Gateway
0Sign in to vote or save
This site does not allow itself to be embedded. You can still read it on the original site — the toolbar below keeps your place in the directory.
Introduction The previous article argued an architecture: move governance from the edges of the agentic loop (a wall of instructions at minute zero, a CI gate at the end) to the inside of the loop. It introduced a working proof of concept, the Platform Planning Gateway (PPG). This article does something simpler: it tells a story. One task, one agent, two runs. In the first run there is no gateway;…
Comments
Nothing yet. Say the first thing.
Sign in to join the conversation.